Getting startedNext steps by role
Next steps by role
Use the same asset for the first team exercise. Each person should be able to identify the evidence they own and show what the next person receives.
Customer guide · Updated 14 November 2026
#First task and handoff, by role
| Role | First task and handoff |
|---|---|
| Operator or shift supervisor | Select the asset and record its operating mode and the time a change was first noticed. Hand the shift observation to the reliability engineer. |
| Reliability engineer or planner | Check the baseline, current reading and competing causes. Record whether inspection is justified, who owns it and when a decision is needed. |
| Maintenance technician | Open the request and confirm the physical asset and measurement position. Enter observations with units and operating conditions. Return the report for engineering review. |
| Process or energy engineer | Explain how a change in throughput, speed, feed or mode affects comparisons. For an ATMAX study, define the production denominator and a comparable reference period. |
| Plant IT or OT administrator | Verify the approved source, account scope and timestamp conventions. Test site isolation and the difference between permission to read and permission to act. |
| Deployment or application engineer | Trace one source value through its asset mapping to the user’s screen. Test the destination, identity and duplicate handling for every enabled external action. |
| Plant sponsor | Review one decision with the people who made it. Check the baseline, trial case count, unresolved cases and owner before expanding scope. |
#Practice with three examples
- Machine reliability. Replay the fan case. The exercise is complete when the trainee can identify the evidence, explain the forecast event and find the resulting request.
- ERP investigation. For a GRID exercise, use approved sample orders, stock records and a dispatch date. Ask which orders depend on an unavailable material. Check each answer against an order line and its inventory timestamp.
- Operational execution. For an Autix design exercise, map an inspection that needs a technician, a part and a shutdown window. Walk through what happens when the part is unavailable and who can approve a revised date.