DRAWINGTO DISPATCH
MANUFACTURINGOPERATING SYSTEM
COPYRIGHT © 2026OSWAR teck inc.

DRAWING TO DISPATCH. ONE CONNECTED SYSTEM.

DESIGN → PROCURE → PLAN → EXECUTE → INSPECT → DISPATCH

FOUR LAYERS. ONE MANUFACTURING ENGINE.

Design & Materials

Drawings, BOMs and raw stock live in one model. A revision shows at once which parts, purchases and work instructions it touches.

Plan

Schedules only what the floor can build — against real machines, operator skills, material on hand and the order operations must follow.

Execute

Each workstation gets the operation, the approved revision and its quality checks. Progress flows straight back into the plan.

Intelligence

A machine stops or a rush order lands. ArcOS traces the impact downstream and issues a revised schedule that protects delivery.

A MACHINE STOPS. THE DELIVERY DOESN’T.

FaultCNC-04 stops

Ultron flags a spindle fault mid-operation.

SPINDLE · CNC-04
TraceImpact mapped

Every dependent operation and order it touches.

11 OPS · 3 ORDERS
Re-planWork moved

Onto capable machines and free operators.

CNC-02 · CNC-07
DispatchFloor updated

New instructions at each affected station.

6 WORKSTATIONS
DeliverDate held

The customer commitment stands.

ORDER 2417 · ON TIME

BUILT FOR EQUIPMENT MADE TO ORDER.

Large rotor assembly in a heavy fabrication hall
Engineer reviewing the production schedule on a tablet on the shop floor

MAKINGMANUFACTURINGAUTONOMOUS