CapabilitiesEnergy and plant performance optimisation
ATMAX

Energy and plant performance optimisation

Explain a change in energy use or throughput under comparable operating conditions. Give the process team a recommendation it can test while maintaining the site’s production and quality constraints.

Product documentation · Updated 15 November 2026

Who uses it
Energy managers, process engineers and production heads

#Choose a meaningful baseline

Define the process boundary, meter, product, time window and production denominator. For a cement grinding line, align electricity consumed in kWh with tonnes produced over the same interval. Separate start-ups, outages, grade changes and partial shifts so the comparison answers a specific question.

#Explain the performance gap

Compare equivalent periods and investigate changes in throughput, feed characteristics, product fineness and equipment availability. Distinguish a meter fault, an accounting mismatch and a real process change. Preserve the alternatives if the available evidence cannot distinguish them.

#Verify an improvement

For illustration, 9,600 kWh over 300 tonnes is 32 kWh/t. At an agreed comparable baseline of 30 kWh/t, the difference is 600 kWh for that run. This is an investigation opportunity. An engineer would need a controlled comparison after the approved change, with quality and throughput checked, to report a realised saving.

#Outcome and verification

What the team gets
A baseline, a quantified variance, candidate explanations and a verification plan for an approved trial.
How to verify it
Recalculate the indicator from the source meter and production records. Name the operating conditions that would invalidate the comparison.