CapabilitiesCommissioning, fleet management and rollout
Commissioning, fleet management and rollout
Take a use case from one machine to more machines or plants without losing track of local differences. A successful installation records which hardware, mappings, configuration and acceptance tests are valid at that site.
Product documentation · Updated 15 November 2026
- Who uses it
- Commissioning engineers, forward deployment engineers and plant administrators
#Commission one asset
Work with the process owner to identify the failure mode and required signals. The acquisition engineer validates channel mapping and units. The commissioning engineer checks the installed path. The deployment engineer verifies the user workflow with the operator. Retain configuration revisions and unresolved exceptions.
#Manage the installed fleet
CONFIQ is intended to manage device configuration across RGX gateways. For each node, record its site, owner, hardware identity, approved configuration and last verified connection. If two sites have the same machine type, check their sensor positions, speed ranges and local alert rules before reusing configuration.
#Expand with acceptance criteria
Trial a new configuration on a small group, review its effects and keep a known working version available for recovery. For a new plant, repeat source-to-screen validation and role tests. Use a site acceptance record to decide when the configuration can be applied more widely.
#Outcome and verification
- What the team gets
- A commissioning record, approved configuration, ownership register and rollout decision for each installation.
- How to verify it
- Trace one displayed value to the source at the second installation. Check local differences and demonstrate how the team restores the prior approved configuration in a test.